Project / Industrial

Axis Works / Rotterdam.

Axis Works combines ambitious design with a delivery strategy shaped around the constraints of Rotterdam, Netherlands.

Completed 2026 Chicago · 680,000 sq.ft
Client Axis Industrial
Sector Industrial / Advanced manufacturing
Role Design + Build
Scale 910,000 sq.ft
The challenge

A dense site with zero room for drift.

The programme combined workplace, retail, public space and major infrastructure interfaces on a constrained urban block.

Early digital logistics modelling and a federated coordination process made sequencing visible before work moved into the field. The result was a construction plan that could adapt without losing line of sight on cost, quality or the design intent.

Measured outcome

Less rework. More certainty.

37% fewer coordination issues reaching site
21% lower projected operational energy demand
14 weeks protected through sequencing strategy
Start with the ambition

Planning something equally ambitious?

Bring us the ambition, constraints and questions. We will help shape the route forward.

Start a conversation